veraiuska Posted December 15, 2015 Share Posted December 15, 2015 Good evening. I have a question on how to face the following case study:We want to increase the number of turbines in an existing wind farm. We have a met mast measuring right behind (~600m, being ~100m rotor diameter length) an existing wind turbines line (down and up wind aligned related to met mast). When building this WaSP project, I am considering that this wind measuring campaign is already registering the existing wake effect from the windfarm in front... My question is, how should I "draw" the existing windfarm in WaSP project? As roughness elements or as windturbines?I usually use free wind field campaigns (non existing wind farms but only future ones). But this time I suppose I should build this project in A different way.Thank you very much for your help,VERA Link to comment
Mark Kelly Posted January 22, 2016 Share Posted January 22, 2016 Hi Vera, you should enter the windfarm as turbines. Cheers,--Dr. Mark Kelly, DTU Wind Energyon behalf of WAsP Link to comment
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now