Jump to content

Jose Luis

Members
  • Posts

    1
  • Joined

  • Last visited

Jose Luis's Achievements

  1. I have a doubt with the software release from 9.0 version to 9.1 because, now that the software has been released, the number of calculations in a project has been increased considerably, for example, now when i finish the structure of a project and go to "do all feasible calculations", the software start with wind atlas calculation, then with wind farm calculation and the last is resource grid calculation, but now, when the resource grid calculation stops, the software re-start to calculate the wind farm and the grid resource again, at least three times. I don't know if is a new software feature or a problem with my software release. I hope that you can give an answer for my doubt, thanks for your time!
×
×
  • Create New...