Hi, I have changed the project density to 1.14 kg/m3. I am aware that this value doesn't affect to AEP calculations, since these calculations are made from the wind turbine power curve. In this project, the closest power curve I have is for 1.15 kg/m3, so that's the one I use. However, when I change the project density there is a first alert message: "The wind turbine generator does not have performance table to match". And when I try to calculate the production at a reference site with the mentiones Porwer Curve for 1.15 kg/m3 "The AEP for turbine site 'Ref 1' cannot be calculated because: there is a mis-match in air density between the project and WTG performance table." How can I solve this? Why AEP can not be calculated if this calculations don't tak einto account the project density? I have changed the project density to 1.15, but I would like to keep the real density (1.14) but perform AEP calculations as well. is that possible? Thanks!