Jump to content

CA1

Members
  • Posts

    7
  • Joined

  • Last visited

Posts posted by CA1

  1. Dear all I am a user of WASP 11.6 and I continue with problems with GE

    1) I have read that GE works with WSG84 datum but when I check where GE has placed the WTG I always find discrepancies ( I have checked with wind farms in operation)

    2) Maybe it is an own problem (divX, drivers or whatever) but when I click the globe button and GE starts, it deploys the wind turbines but the icons don't appear

    Thanks for your commentaries
  2. Yes there are two periods

    First period from October to January high wind speeds and form June to September low wind speeds

    The wind farm is located in Oaxaca (Mexico) flat terrain (RIX =0) maybe it can be give you an idea

    Also I have found this article http://www.sciencedirect.com/science/article/pii/S0960148104000618 where explains that there is an understimation of the wind resource

    I am totally lost about it ¡¡¡¡ maybe with a CFD simulation ?¿

    Thanks
  3. Hi

    I am trying to simulate with WASP a site with a bimodal wind distribution

    As I have checked, WASP is always understimating the energy output

    Any idea to simulate and obtain an accurate energy output?

    Thanks in advance
×
×
  • Create New...